Putting The Devices Into Operation; Em 500 Receiver - Sennheiser evolution wireless G3 500 Series Instruction Manual

Table of Contents

Advertisement

Putting the devices into operation

Fitting the device feet
Mounting the rack
mount "ears"
Connecting the
rod antennas
12
Putting the devices into operation

EM 500 receiver

Setting up the receiver on a flat surface
Place the receiver on a flat, horizontal surface. Please note that the device feet can leave
stains on delicate surfaces.
Clean the base of the receiver where you want to fix the device feet.
Fit the device feet to the four corners of the receiver.
The rack mount "ears" are designed to help protect the operating elements from
damage or deformation, e.g. if the receiver is dropped. Therefore, fasten the
stacking elements, even if you do not want to rack mount your receivers.
To fasten the rack mount "ears"
Unscrew and remove the two recessed head screws (M4x8) on each side of the receiver
(see diagram).
Secure the rack mount "ears"
recessed head screws.
The supplied rod antennas
Connect the antennas. You have the following options:
– You can connect the rod antennas to the rear of the receiver.
Align the antennas in a V-shape.
:
to the sides of the receiver using the previously removed
are suitable for use in good reception conditions.

Advertisement

Table of Contents
loading

This manual is also suitable for:

Evolution wireless g3 ew 500-965 g3-a-xEvolution wireless g3 ew 500-965 g3-b-xEvolution wireless g3 ew 512 g3-a-xEvolution wireless g3 ew 572 g3-b-xEvolution wireless g3 ew 572 g3-a-xEvolution wireless g3 ew 500-935 g3-a-x ... Show all

Table of Contents