Download Print this page

Installation - Anzzi FIELD SP-AZ042 Install Manual

Hide thumbs Also See for FIELD SP-AZ042:

Advertisement

INSTALLATION (SETUP)
Figure A
IMPORTANT
Before drilling any holes for the shower panel brackets, ensure there are no hidden cables or
pipelines aligned with the desired drilling position.
Step A
Drill the two holes for the top bracket 1" apart at the desired height.
Step A.2
Drill the two holes for the bottom bracket 1" apart at approximately 45" below the top bracket.
PERFECTION IS OUR TRADITION™
pg. 4

Advertisement

loading
Need help?

Need help?

Do you have a question about the FIELD SP-AZ042 and is the answer not in the manual?

Subscribe to Our Youtube Channel