H&S 5134 Operator's Manual And Parts List page 7

Top shot manure spreaders
Hide thumbs Also See for 5134:
Table of Contents

Advertisement

H&S DEALER PRE-DELIVERY CHECK LIST(CONT.)
AFTER COMPLETION, DEALER SHOULD REMOVE AND RETAIN FOR RECORDS
(Signature of Pre-Delivery Inspector)
This check list that follows is an important reminder of valuable information that should be
passed on to the customer at the time this machine is delivered.
Check off each item as you explain it to the customer.
This delivery check list, when properly filled out and signed assures the customer that the
Pre-Delivery Service was satisfactorily performed.
Explain to the customer that the Pre-Delivery Inspection was made.
Explain to the customer all the safety precautions they must excercise when operating this
unit.
Explain to customer that regular lubrication is required for proper operation and long life of
machine. Show customer the Lubrication Chapter of the Operator's Manual.
Give the customer the Operator's Manual and make sure they read and understand all
operating and service instructions.
Record model and serial number on this page and page 37 of this Operators Manual.
Have customer sign a completed "Warranty Registration," and mail it promptly.
Date Delivered
Dealer's Name
By
Signature of Original Buyer
Note: Warranty is not valid until warranty card is completed and returned to H & S Mfg. Co., Inc.
(Dealer's Name)
Model Number
DEALER DELIVERY CHECK LIST
-5-
Serial Number
(Inspection Date)

Advertisement

Table of Contents
loading

Table of Contents