2. Counterweight combination and assembly sequence
Total weight (t)
3. Notes on erection
• In lifting operation, different counterweight combination can be selected according to the load
lifting capacity.
• Well observe the counterweight combination sequence, and make sure the counterweight slab I is
placed on the bottom of combined counterweight.
• Set up the crane on a firm and level ground.
• Adjust the LMI working condition setting: fully-extended outriggers, counterweight of 0 t, parts
of line (Max. pulling force of single line is 12 t).
• The working radius for loading counterweight should accord with the Total rated lifting load with
Chapter 5
counterweight of 0 t.
• Through the programmable controller, set the operation curve features at the time of installation.
• Put the counterweight on the chassis frame one by one (observe the sequence).
5-2
Accessories
Single weight (t)
65
12.5+2×10+9.5+2×11.5
42
12.5+2×10+9.5
32
12.5+10+9.5
22
12.5+9.5
QAY220 All Terrain Crane Operation Manual
Ⅰ+2×Ⅱ+Ⅲ+2×Ⅳ
Ⅰ+2×Ⅱ+Ⅲ
Ⅰ+Ⅱ+Ⅲ
Ⅰ+Ⅲ
Combination sequence
Courtesy of CraneMarket.com