Kohler 1835-GW-0 Installation And Care Manual page 4

Bath with airjets with heated surface
Table of Contents

Advertisement

Available languages

Available languages

Prepare the Blower (Remote Site) (cont.)
• The power cord must be supported at intervals along its length in accordance with local codes.
Power cords must not rest on surfaces or floors that are subject to flooding.
• All material needed for the relocation must be supplied by the installer.
Additional tools and materials you will need:
• Electrician pliers
• Assorted screwdrivers
• Adjustable wrench
• Drill and bits to install the blower mounting fasteners
• 18 AWG non-metallic sheathed cable, two conductors with ground, with support clips, as required
• One 4" (102 mm) x 2" (51 mm) electrical junction box with cover, gasket, and mounting screws
• Three strain reliefs - one must fit the blower motor cover with standard National Pipe Thread (NPT)
threads. The other two must fit the holes in the new junction box.
• Six wire connectors (wire nuts or equivalent)
• 1-1/2" PVC or other rigid pipe with fittings, unions, PVC cement (or equivalent fastening method),
and support clips, as required
• Four fasteners (such as flathead wood screws or concrete anchors) to secure the blower motor
• Solid copper 8-gauge bonding wire, 36" (914 mm)
1204120-2-A
4
Kohler Co.

Advertisement

Table of Contents
loading

Table of Contents