Lonworks Interface Test Run - Panasonic LonWorks CZ-CLNC2 Installation Instructions Manual

Table of Contents

Advertisement

4. LonWorks Interface Test Run

Before performing a test run of the LonWorks Interface, perform
test runs of the A/C units and assign central control addresses for
A/C units.
[LonWorks Interface Test Run Procedure]
(1) Press and hold touch-switch S001 on the main circuit board for 5
seconds or longer.
Test run mode is enabled for the main circuit board that is
currently being controlled. LD001 illuminates, and LD002 –
LD008 turn off.
COM
LD
1
2
(2) Press touch-switch S002. The data LEDs appear as shown in the
tables below.
In addition, the assigned indoor unit groups start and stop as
shown in the tables below.
STEP 1
Data
COM
2
3 4 5 6 7 8
1
STEP 2
Data
COM
2
3 4 5 6 7 8
1
STEP 3
Data
COM
3 4 5 6 7 8
1
2
STEP 4
Data
COM
2
3 4 5 6 7 8
1
Data
3 4 5 6 7 8
Indoor unit Gr
Start/stop
0
Stop
1
Stop
2
Stop
3
Stop
S002
PUSH
Indoor unit Gr
Start/stop
0
Start
1
Stop
2
Stop
3
Stop
S002
PUSH
Indoor unit Gr
Start/stop
0
Start
1
Start
2
Stop
3
Stop
S002
PUSH
Indoor unit Gr
Start/stop
0
Start
1
Start
2
Start
3
Stop
S002
PUSH
STEP 5
COM
Data
2
3 4 5 6 7 8
1
STEP 1
COM
Data
2
3 4 5 6 7 8
1
(3) Be sure to reset the power after the LonWorks Interface test run
is completed.
Indoor unit Gr
Start/stop
0
Start
1
Start
2
Start
3
Start
S002
PUSH
Indoor unit Gr
Start/stop
0
Stop
1
Stop
2
Stop
3
Stop
S002
PUSH
9