Bracket Geared Motor - Daewoo FRN-U20DAI Service Manual

Table of Contents

Advertisement

8-2. Bracket Geared Motor Assembly
1) Disassembling Procedure
NO
DISASSEMBLING PROCEDURE
1
▷Remove 2 screws.
2
▷Unscrew (4 points).
3
▷Separate 6 pin housing of Bracket
Geared Motor from the top connector.
2) How to Check Hose Ice Maker Tube Assembly
PARTS
▷SPEC. NAME
:DAG-6502DEC
▷VOLTAGE
Geared Motor
:220/240V,50Hz
▷SPEC. NAME
:Cube SN8
Cube Sol Valve
▷VOLTAGE
:220/240V,50Hz
SPEC.
▷Check resistance value of
2 terminals with a Multi Tester.
▷Check resistance value of
2 terminals with a Multi Tester.
NO
DISASSEMBLING PROCEDURE
4
▷Pull forward Bracket Geared Motor.
5
Unscrew (red 4 screws).
Unscrew (blue 4 screws).
6
▷Check Solenoid Valve and Geared Motor.
HOW TO CHECK
37
CRITERION
▷GOOD : 11.3Ω(±10%)
(10.8 ~ 12.7Ω)
▷DEFECTIVE ;
Change the Geared Motor.
▷GOOD : 145Ω(±8%)
(133 ~ 156Ω)
▷DEFECTIVE ;
Change the Cube Sol Valve.

Advertisement

Table of Contents
loading

Table of Contents