2. Loosen the screws on the front cover of the StorEdge Connection Unit using the supplied Allen key, as
shown below:
3. Remove the StorEdge Connection Unit cover.
4. Open the required conduit knockouts according to the conduits used in the installation (refer to the
figure below for required knockouts; some of the knockouts may already be open but sealed): The
knockouts are located at the bottomof the enclosure, each with two sizes: ¾'' and 1''. Open the
required knockouts, taking care not to interfere with any of the internal components. A Unibit drill
may be used.
NOTE
Unused conduit openings and glands should be sealed with appropriate seals.
SolarEdge-StorEdge Installation Guide MAN-01-00262-1.0
Figure 10: Opening the StorEdge Connection Unit cover
Figure 11: StorEdge Connection Unit knockouts