Delivery checks

Check that everything has been delivered and that the goods are not transport
damaged. Any delivery faults must be reported to the supplier. Transport
damage must be reported to the forwarder.
4.2

Preparations for installation

Check that the burner's measurements and capacity range is suitable for
the boiler in question. The power information on the data plate refers to the
burner's max. and min. power.
4.3

Oil supply

In order to achieve good operational reliability it is important that the oil
supply system is laid out correctly.
Observe the following:
Choice of pipe diameters, pipe lengths and height differences (refer
to
pump instructions).
Piping should be run with a minimum of joints/compression fittings.
Pipework must be laid out so that oil hoses are not subjected to
tension or overbending when the burner is swung out or removed for
service.
The oil filter should be installed so that the filter cartridge can easily
be replaced
4.4

Electrical connection

Before electrical installation is begun, electricity must be switched off at the
main switch. If the boiler has a 7-pole or a 4-pole Eurostecker (only on 2-stage
burners), these often fit directly to the burner. Otherwise use the connectors
supplied. The operating thermostat, the max. thermostat and the inspection
hatch (where fitted) interlock can then be wired in series on the incoming
phase connected to L1 or connected between T1 and T2. In the first mentioned
case a jumper is installed between T1 and T2.
(Refer to connection in the section Electrical equipment).
If any electrical connection is used other than that
!
recommended by Enertech, there may be a risk of equipment
damage and personal injury.
4.5

Choice of nozzle

(Technical data): Recommended nozzle and nozzle table.

Brake plate and airflow setting

4.6
Before operations basic burner setting may be made according to the diagram.
(Refer to basic settings). Note that this only refers to the basic setting; the
setting must be adjusted after the burner has been started.
At this time flue gas analysis and soot measurement must be carried out.