4.10.2.4 Installation and wiring of distribution equipment (read it according to your demand)
Before installing the distribution equipment, open the box for inspection first, based on the
device list, construction drawing and device technical material, check the main uint, attachment
and spare parts of the device, product certificate, technical material and specification, to see if
they are complete. Tighten the screws used for installation and check the installation strength.
Installation of junction box: install it to the place near the assembly string to decrease cable
pavement length and wire breakage. Protection measures shall be taken in the places where
cable is entering into the junction box to avoid scratching the cable. After wiring for the
conjunction box, please check the wiring strength and tightness of the box. Close the cover and
tighten with keys after inspection.
Installation of grid-connected cabinet: carry out installation according to the arrangement
of construction drawing. The cabinet shall be earthed, connect each cabinet with base
separately. Check the connecting wire of controller inside the cabinet to see if it is consistent
with circuit diagram and wiring diagram. Its rated voltage must be consistent with controlling
and operating power voltage. At last, adjust the overcurrent circuit breaker of the cabinet, all
relays and mechanical chain, etc.
5 Check Items after Installation and Trial Run
5.1 Check Items after Installation
Check Items
Has the unit been fixed firmly?
Have you done the gas leakage test?
Is the unit get proper thermal insulation?
Does the unit drain well?
Is the voltage in accordance with the rated voltage
specified on the nameplate?
Is the electric wiring and piping connection
installed correctly and securely?
Has the unit been earthed securely?
Is the power cord specified?
Has the inlet and outlet been blocked?
Has the pipe length and refrigerant charging
amount been recorded?
Is the address code of outdoor modules correct?
Is the address code of indoor units and wired
controller correct?
Has the communication line been connected
correct?
Is the piping connection and valve status right?
Whether phase sequence of external power cord is
correct or not?
Whether the engineering piping work and wiring
holes are sealed?
Conditions Might Happen
The unit may drop, shake or emit noise.
It may cause insufficient cooling/heating
capacity.
It may cause condensation and dripping.
It may cause condensation and dripping.
It may cause malfunction or damage the part.
It may cause malfunction or damage the part.
It may cause electrical leakage.
It may cause malfunction or damage the part.
It may cause insufficient cooling/heating
capacity.
The refrigerant charging amount is not
accurate.
The unit cannot run normally. Communication
malfunction might happen.
The unit cannot run normally. Communication
malfunction might happen.
The unit cannot run normally. Communication
malfunction might happen.
The unit cannot run normally.
Operation failure occurs or unit is damaged.
Maybe there are mice biting the wires, which is
the cause of malfunction.