Installation Checklist; Schematic Diagram - Raymarine Evolution EV-2 Installation Instructions Manual

Hide thumbs Also See for Evolution EV-2:
Table of Contents

Advertisement

6.1 Installation checklist

Installation includes the following activities:
Installation Task
1.
Plan your system.
2. Obtain all required equipment and tools.
3. Site all equipment.
4. Route all cables.
5. Drill cable and mounting holes.
6. Make all connections into equipment.
7.
Secure all equipment in place.
8. Power on and test the system.

Schematic diagram

A schematic diagram is an essential part of planning any installation. It is also useful for any future
additions or maintenance of the system. The diagram should include:
• Location of all components.
• Connectors, cable types, routes and lengths.
30

Advertisement

Table of Contents
loading

Table of Contents