Trane ProSpace PTEG0701GAA Installation, Operation And Maintenance Manual page 28

Packaged terminal air conditioner (ptac) r32 ac/heat pump with electric heat
Table of Contents

Advertisement

D D i i s s a a s s s s e e m m b b l l i i n n g g t t h h e e U U n n i i t t
10. Removed the screw holding the control cover plate
and pull out the wiring terminal connecting the
control cover plate and the electric box. Then,
remove the cover plate and electric box.
11. Remove four (4) screws holding the display board
and then remove the display board.
12. Remove four (4) screws holding the baffle plate for
the electric box and then remove the baffle plate.
13. Pull out the motor wiring terminal.
28
14. Remove four (4) screws holding the right-side baffle
plate for the electric box and then remove the right-
side baffle plate.
15. Remove seven (7) screws holding the right-side
plate for the electric box and then remove the right-
side plate.
16. Remove two (2) screws holding the front cover of
the electric box and then remove the front cover.
17. Remove three (3) screws holding the electric box
and then remove the electric box.
18. Remove seven (7) screws holding the middle
PTAC-SVX004A-EN

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents