SIDE COVER – SCREW TIGHTENING SEQUENCE
Starting with the number "1" screw location,
tighten sequentially through to "16."
Torque each screw to 105 - 155 lb-in
(11.87 - 17.52 Nm).
NOTE: As a general rule, use the low end of
the torque specification.
Figure 38, Screw tightening sequence diagram
ZT-2800
/ZT-3100
/ZT-3200
/ZT-3400
41
®
®
TM
®