INSTALLATION MANUAL PADDINGTON GROOVE EFFECT GARDEN OFFICE 2.2m X 2.8m G1-2228NCO Unique Product Reference Number Manufacturer: __________________________ Dunster House Ltd. Caxton Road Bedford Customer Service Department: Bedfordshire cs@dunsterhouse.co.uk England www.dunsterhouse.co.uk MK41 0LF...
Page 2
In the unlikely event that you need to contact us, please do so in writing to: Email: cs@dunsterhouse.co.uk Post: Dunster House Ltd, Caxton Road, Elms Farm Industrial Estate, Bedford, MK41 0LF, England. Our customer Service department is open 9 a.m. to 5 p.m. Monday to Friday. Please include your Sales Order (SO) number in any correspondence with Customer Service to enable them to locate your file.
Pre-drill parts before fixing screws. Changing Brackets (Variation 1) Item: Panel 3 (Window) 8x 35mm Csk screws Important Undo screws on existing panel and When fixing, it is important that the brackets are pushed fasten brackets as shown below up to the edge of the WPC, flush and square. DO NOT FIX TWISTED OR OUT OF LINE AS THIS WILL CAUSE ISSUES WHEN CONNECTING.
Page 13
Pre-drill parts before fixing screws. Changing Brackets (Variation 1) Item: Panel 4 (Solid) 8x 35mm Csk screws Undo screws on existing panel and Important fasten brackets as shown below When fixing, it is important that the brackets are pushed up to the edge of the WPC, flush and square. DO NOT FIX TWISTED OR OUT OF LINE AS THIS WILL CAUSE ISSUES WHEN CONNECTING.
Page 14
Pre-drill parts before fixing screws. Changing Brackets (Variation 2) Item: Panel 3 (Window) 8x 35mm Csk screws Important Undo screws on existing panel and When fixing, it is important that the brackets are pushed fasten brackets as shown below up to the edge of the WPC, flush and square. DO NOT FIX TWISTED OR OUT OF LINE AS THIS WILL CAUSE ISSUES WHEN CONNECTING.
Page 15
Pre-drill parts before fixing screws. Changing Brackets (Variation 2) Item: Panel 4 (Solid) 8x 35mm Csk screws Undo screws on existing panel and Important fasten brackets as shown below When fixing, it is important that the brackets are pushed up to the edge of the WPC, flush and square. DO NOT FIX TWISTED OR OUT OF LINE AS THIS WILL CAUSE ISSUES WHEN CONNECTING.
Page 16
Pre-drill parts before fixing screws. Connecting two panels Step 1: Align panels Opposing brackets Step 2: lift right panel (bracket pointing downwards) approximately 100mm to clear opposing brackets. Opposing brackets Step 3: Slide panel downwards to engage brackets Page 16...
Page 17
Pre-drill parts before fixing screws. Step 5: Panel 7 & 3 or 4 Item: 5a - 1x Panel 7 4x 35mm Csk screw 5b - 1x Panel 3 or 4 Panel 7 4x 35mm Csk screw Panel 3 or 4 Fasten brackets to wall panels 35mm Csk.
Page 18
Pre-drill parts before fixing screws. Step 7: Panel 4 or 3 and 7 Panel 7 Item: Panel 4 or 3 1x Panel 4 or 3 7a - 4x 35mm Csk screw 6x 70mm Csk screw 7b - 1x Panel 4 or 3 4x 35mm Csk screw Panel 4 or 3 Panel 6...
Page 19
Pre-drill parts before fixing screws. Step 9: Rafter assembly Item: 9a - 4x Rafters 2x Rafter Supports 4x WPC Ties 48x 35mm Csk Screw 4x 70mm Csk screws Rafter Support 70mm Csk screw 35mm Csk screw Rafters Pre-assemble rafter assembly using 70mm Csk screws 35mm and 70mm Csk screws (skewed)
Page 21
Pre-drill parts before fixing screws. Panel B Step 13: Roof panels (right s.) Item: 13a - 2x Roof Panel B 1x Roof Panel C 34x 70mm Csk screw Panel C Panel B 70mm Csk screws (x34) Flush with Ridge beam Panel C Step 14: Roof panel (left s.) Item:...
Page 22
Pre-drill parts before fixing screws. Step 15: Floor Panel (left s.) Item: 15a - 1x Floor Panel A 21x 70mm Csk screw All floor panels should be in position before fastening with screws. Floor panels will allow gaps between floors and walls. Gap between walls and floor Floor Panel A...
Page 23
Pre-drill parts before fixing screws. Step 16: Doors and window/s The following principles apply for both door and windows. Position the door/ window with frame into the aperture (from outside) and ensure that the diagonals are equal (A=B). The door/ window frames also need to be vertically aligned with base (90) before continuing.
Page 24
Pre-drill parts before fixing screws. Step 17: Roof membrane Item: 17a - Roof Membrane We supply roof membrane which provides an extra layer of protection. Ensure the roof panels are dry and firmly secured before putting on the membrane. Cover all of the roof panels (including edges) using the roof membrane supplied leaving a minimum of 5 - 10mm overhang and then cut off the excess.
Page 25
Pre-drill parts before fixing screws. Clout nails Step 19: Roofing felt Felt Roof membrane Item: 19a - 1 Roll felt Clout nails a. Starting at the lowest edge of the roof, lay the felt horizontally across the roof panels. Make sure that the lowest edge of the felt overhangs the edge of the roof by approximately 30mm and the front and back by 50mm.
Page 26
Assembly Steps for (Hexagonal Shingle) Plastic Waterproof Membrane Fully cover the roof with the plastic waterproof membrane leaving a minimum of 20mm overhang or 40mm overhang if the optional guttering is to be installed. Use a staple gun or tacks to secure the membrane to the roof boards. Hexagonal Shingles Our hexagonal shingles come with a 'peelable' plastic backing which must be removed before installing.
Page 27
Assembly Steps for (Shingles) Plastic Waterproof Membrane: Fully cover the roof with the plastic waterproof membrane leaving a minimum of 20mm overhang or 40mm overhang if the optional guttering is to be installed. Use a staple gun or tacks to secure the membrane to the roof boards. Shingles Our rectangular shingles come with a thin clear strip on the back marked 'DO NOT REMOVE', do not peel this off.
Pre-drill parts before fixing screws. Step 23: Drip Edges Item: 23 - 10x Drip edge trim 34x - 30mm Poly pin nail Cut drip edge trims to appropriate lengths. They should fit snuggly between joint trims. Apply clear silicone to ALL wall panels, gaps and trims before fastening.
Page 31
Pre-drill parts before fixing screws. Step 24: Wind Braces Item: 4x WPC 1253x50x10.75 20x 35mm Screws 20x Screw Cover (WHT) Place 2x WPC 1253x50x10.75 trims on top of the garden office roof, make sure the trims are flush with the roof edges and each other at the top of the apex as shown in the images bellow.
Page 32
Pre-drill parts before fixing screws. Step 24: Window trims Item: 24 - 4x MDF 1230x20x6.B 4x MDF 860x20x6.B 36x 30mm Panel pins Trims should be fastened with panel pins MDF 2095x1060x6.B v2 MDF 860x20x6.B Inside view Step 25: Door trims Item: MDF 1450x20x6.B 25 - 1x MDF 1962x20x6...
Page 33
Glazing Windows and Doors Sealed units are approximately 10mm smaller in length and width than the aperture. This difference in size will be packed using bridge packers (4mm), black shims (2mm), and green shims (1mm). Bridge packers must be used only against the frame, while shims are to be used only next to sealed units.
Page 34
Glazing Windows and Doors 5. After packing the sealed units correctly, refit the beads in the same position as you removed them; start with the smallest lengths first before inserting the longer lengths. Carefully use a nylon or non-marking rubber mallet to help tap the beads into position, starting at the ends.