Husqvarna BS 75 Operator's Manual page 17

Hide thumbs Also See for BS 75:
Table of Contents

Advertisement

Available languages

Available languages

5. Remove the 7 screws.
6. Remove central bolt to release bearing hub.
7. Remove the 5 nuts.
8. Remove the vibration damping plate and the 5
vibration damping units.
9. Install 5 new vibration damping units in the opposite
sequence.
To replace the vibration damping units BS 110
1. Remove the blade. Refer to
page 18 .
WARNING:
with Kevlar. The blades are very sharp.
2. Remove the weights. Refer to
the weights BS 110 on page 10 .
1804 - 003 - 28.08.2023
To replace the blade on
Use protective gloves
To remove and install
3. Remove the 6 screws and the bottom cover.
4. Remove the 5 nuts and the cutting head.
5. Remove the 5 washers (A).
C
A
6. Remove the 5 screws (B) and the 5 vibration
damping units (C).
7. Install 5 new vibration damping units in the opposite
sequence.
B
17

Advertisement

Table of Contents
loading

This manual is also suitable for:

Bs 110

Table of Contents