Installation; Dimensional Drawing - Xylem Rule-Mate 500 Instruction Manual

Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
During the winterization of a vessel, it's recommended that you remove the check
valve (if equipped) and drain any residual water from the plumbing.
Periodically remove, clean and inspect bilge pump, check valve and its surroundings
for damage or debris that may reduce the performance of the pump.

Installation

Push tabs on either side of the pump to remove pump from the base.
We recommend using #8 stainless steel flathead screws of an adequate length as
to secure the pump but not penetrate the entire thickness of the hull. Use a flexible
sealant in the screw holes to prevent water from penetrating the screw holes.
Insert the pump into the base and push down until an audible "click" is heard.
Flow — GPH (LPH)
GPH Series
500
800
1100

DIMENSIONAL DRAWING

Inches (Millimetres)
@ 0 ft
0m – 0 kPa
536 (2029)
942 (3566)
1128 (4270)
3.4"
(8.6cm)
6.4"
(16.3cm)
@ 3.3 ft
1m – 10 kPa
2m – 20 kPa
289 (1094)
644 (2438)
792 (2998)
(11.2cm)
DESSIN DIMENSIONNEL POUCES (MILLIMÈTRES)
DISEGNO DIMENSIONALE Pollici (millimetri)
DIMENSIONELL RITNING tum (millimeter)DIBUJO
7
@ 6.7 ft
115 (435)
416 (1575)
456 (1726)
2.9"
(7.4cm)
4.4"
MAßZEICHNUNG Zoll (Millimeter)
MAATTEKENING Inch (Millimeter)
DIMENSIONAL Pulgadas (milímetros)
Max Head
Height
9' (2.7m)
12' (3.7m)
10' (3m)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Rule-mate 800Rule-mate 1100

Table of Contents