Opera ECLIPSE Instructions Manual page 11

Mattress system
Table of Contents

Advertisement

6.4 Connect Hose Couplers
Firmly connect the air hose couplers to the couplers on the power unit.
6.5 Check CPR Pull Cord
Unzip mattress cover and inspect CPR latch is fully inserted into the socket. It
should arrive fully inserted when first purchased, but it is worthwhile checking,
especially when re-installing the mattress.
6.6 Power Up Unit
Plug the power unit into an electrical outlet, and turn on the main power rocker
switch on the right side of the power unit.
Press power button on the control panel to inflate the mattress system. Please
wait for approx. 30 seconds until the power unit is ready before making any
program adjustment.
6.7 Wait for Inflation
Wait approximately 30 minutes for the mattress to inflate fully before allowing
the patient to lie down on the mattress.
6.8 Ensure Patient Comfort
Perform the firmness and hand checks in section 7. Program settings before
leaving the patient for long periods of time.
operabeds.com | 0333 222 8584 | 10

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the ECLIPSE and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Mam049-30

Table of Contents