Download Print this page

Euroscreen LEONARDO FR37 Installation Manual

Frame screen

Advertisement

Quick Links

INSTALLATION MANUAL
FRAME SCREEN
LEONARDO FR37
ORIGINAL INSTRUCTIONS IN ITALIAN LANGUAGE
Translation into English language
This document is property of Euroscreen Srl.
Any reproduction without authorization is prohibited

Advertisement

loading
Need help?

Need help?

Do you have a question about the LEONARDO FR37 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Euroscreen LEONARDO FR37

  • Page 1 INSTALLATION MANUAL FRAME SCREEN LEONARDO FR37 ORIGINAL INSTRUCTIONS IN ITALIAN LANGUAGE Translation into English language This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 2 Leonardo FR37with others projection surfaces packaging content Structural frame assembly Projection cloth mounting 3.3a Oyster surface mounting 3.3b Other projection surfaces mounting (different from Oyster) Thin bezel assembly INSTALLATION Wall mounting This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 3 Mod. LEONARDO FR37 1.0 GENERAL INFORMATION FRAME SCREEN DESCRIPTION The frame screen LEONARDO FR37 is entirely manufactured in Italy, with high quality materials and projection cloths that guarantee to your system excellent quality performances in compliance with CE legislation. The screen is designed specifically for home cinema or professional projections.
  • Page 4 PVC could be damaged and make waves for the explanations given above. The PVC cloth is very sensitive to temperature range. We advise to mount the screen in environments with an ambient temperature in the range of 20°-25°C. This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 5 Serial number Motor power Operating frequency Power consumption * Not applicable to frame screens. “A” SERIAL N. MANUFACTURED BY EUROSCREEN SRL-ITALY MADE IN ITALY “B” “C” “D” This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 6: General Description

    GENERAL DESCRIPTION The figures below describe the main elements of the product. Front view Velvet covered thin bezel Projection surface Rear view Thin bezel Structural frame Mounting brackets This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 7 Installation manual Mod. LEONARDO FR37 Profiles combination Thin bezel covered with velvet Structural frame aluminum profile Projection surface Mounting bracket Rear view mounting bracket ø6 ø18 This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 8 Pcs. 2 The manufacturer declares that the projection surface Oyster cannot be mounted environment with or more of humidity rate, because humidity can cause waves on the cloth. This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 9 Metal corners (C) Projection surface (D) Pcs. 16 Pcs. 01 Galvanized rods (E) Rubber bands (E) Pcs.04 Protective cloth Screws + wall plugs (G) Pcs. 01 Pcs. 02 This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 10 Installation manual Mod. LEONARDO FR37 STRUCTURAL FRAME ASSEMBLY The first step of Leonardo FR37 screen installation consists in assembling the structural frame. OYSTER Surface PVC Surface The slots to be The slots to be used to insert the used to insert the...
  • Page 11 Mod. LEONARDO FR37 Step 2a Put the short structural frame segments (A) close to the metal corners (C). Step 2b Insert the short structural frame segments (A). This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 12 Step 3a Place the remaining metal corners (C) close to the remaining long structural frame segment. Step 3b Insert the metal corners (C) to this frame segment. This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 13 Before tightening all the dowels, in order to perfectly close the metal corners to the structural frame segments, check that the measurements L1 and L2 are the same. The maximum tolerance is 2 mm. L1 = L2 This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 14 Inside the structural frame Mistake B External corner OPEN Mistake B Outside the structural frame Check carefully as above and proceed with tightening the dowels on each corner. This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 15 Check the surface on which the projection cloth is lying. Check that the velvet cover is perfectly clean. Wrong position Correct position cursors facing downwards cursors facing upwards Projection side This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 16 1° 1° 2° 2° 3° 3° 4° 2° 1° 3° 5° 3° 2° 1° 1° 2° 3° This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 17 Now you can proceed centering the projection surface in the most precisely way. In case it is difficult to center the surface, remove some rubber bands in order to release a bit the tension on the surface. This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 18 In the drawings below, it is shown how the rubber bands have to be fixed to the cursors. Step 01 Step 02 Step 03 Step 04 Step 05 This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 19 This time is necessary because, after the bezel is mounted on the structural frame, it is not possible to make adjustments on the rubber bands any more. Proceed to chapter 3.4 at page 26. This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 20 Do not move the projection surface once it is layed down. Projection surface Projection side Check that the area where you are laying the projection cloth is perfectly clean. Protective cloth This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 21 Now, lay the pre-assembled structural frame on the projection surface, making sure that the rear side of the frame is facing upwards. Correct position Wrong position cursors facing upwards cursors facing downwards This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 22 At the end of this procedure, you will notice that the rubber band is softer and its length is increased of about 5 mm. This procedure has the aim to make the screen fixing and eventual regulations easier. This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 23 This operation has to be carried out by at least two professional people, taking care that the surface is very delicate and any damage on it will be permanent. Step 1 Step 2 Step 3 Step 4 Step 5 This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 24 Last Last Last Last This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 25 This time is necessary because, after the bezel is mounted on the structural frame, it is not possible to make adjustments on the rubber bands any more. This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 26 With a suitable Allen key, loose the dowels turning Correct position counterclockwise. Wrong position This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 27 The figure below indicates how to fix the thin bezel profile to the structural profile. Before fixing thin bezel, make sure that it is PERFECTLY aligned with the structural frame. Now tighten the dowels. This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 28 (C) to be fixed. Insert the metal corners without tightening them, making sure that the dowel is loose and but not completely unscrewed. This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 29 Insert the metal corners carefully to the short sides and place the long thin bezel profiles close in order to complete the frame mounting. At this point, screw the dowels tightly. This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...
  • Page 30: Installation

    Front view Rear view Wall mounting Wall mounting brackets brackets Produttore/Manufacturer/Hersteller/Produtor Euroscreen Srl – Via Stiria, 45/16 – 33100 Udine – Italy – VAT n. IT02162500306 This document is property of Euroscreen Srl. Any reproduction without authorization is prohibited...