Download Print this page

enphase IQ Energy Router+ Quick Install Manual page 4

Hide thumbs Also See for IQ Energy Router+:

Advertisement

3
Setting up the SG Ready Relay
The following hardware (not included in the box) is required for installa-
tion:
Miniature circuit breaker (MCB), B16 rated 16A can be used to pro-
tect the SG Ready Relay
Electrical cabling to power the relay (two-wire L/N 1.5 mm²)
Electrical cabling to connect the relay dry contacts with the SG
Ready Heat pump interface contacts (4 wires each with 0.75 mm²
diameter)
Ethernet cable to connect to home router or Ethernet switch:
IEEE 802.3 CAT 6, twisted pair (UTP)
Installation steps
A ) Location: The relay can be installed in the main panel if space is not
a constraint or can be installed in a separate sub-panel closer to the
location of the heat pump
NOTE: Ethernet cable from home router or Ethernet switch should
be accessible to the location of install of the relay to ensure network
connectivity.
B ) Mounting: The relay is DIN rail mountable.
C ) Electrical connections:
1.
Wire the supply wires coming from the output of the circuit
breaker to input of the relay as shown in the following figure:
SG Ready
Module
N
C1
L
18 19
20 21 22 23 24
25 26
27
230V AC
Rel. 1
LAN
Sensor / RS232
Input
I1
I2 I3
I4
LV PWR
WARNING: Make sure the circuit is not energized while working on
the electrical connections. Make sure all upstream breakers are open and
low or zero voltage is verified using a multimeter.
2.
Wire the cabling from the dry contact relays (Rel 1 and Rel 2)
to the SG Ready contacts on the heat pump as shown in the
following figure.
SG Ready
N
C1
L
18 19
20 21 22 23 24
25 26
230V AC
Rel. 1
LAN
Sensor / RS232
Input
I1
I2 I3
I4
LV PWR
C2
contacts
28 29
30
31 32
33
34 35
max. 16A / 250V AC
max. 10A / 24V DC
Rel. 2
Rel. 3
Rel. 4
Select
OK
2
3
4
1
Status
I5
I6 I7
I8
Stop
Module
C2
contacts
27
28 29
30
31 32
33
34 35
max. 16A / 250V AC
max. 10A / 24V DC
Rel. 2
Rel. 3
Rel. 4
Select
OK
1
2 3 4
Status
I5
I6 I7
I8
Stop
C ) Network connection: Plug the Ethernet cable coming from
the home router or Ethernet switch into the LAN port of the
SG Ready Relay as shown in the following figure:
SG Ready
Module
N
C1
L
18 19
20 21 22 23 24
25 26
27
28 29
230V AC
Rel. 1
1
LAN
Sensor / RS232
Input
I1
I2 I3
I4
I5
LV PWR
For SG Ready Relay technical data sheet, directives, and certifica-
tions, click
SG Ready Relay
or scan the following QR code:
4
Configure EV charger and/or heat pump
Before you can pair the EV charger and/or heat pump to the IQ Energy
Router, configuration of the supported EV charger for OCPP and/or heat
pump for SG Ready Relay is needed. For more detailed instructions, scan
the following QR code or click documentation.
C2
contacts
30
31 32
33
34 35
max. 16A / 250V AC
max. 10A / 24V DC
Rel. 2
Rel. 3
Rel. 4
Select
OK
2 3 4
Status
I6 I7
I8
Stop

Advertisement

loading

This manual is also suitable for:

Hems-hp-01Hems-gw-01