Installation Examples - Graco Pulse TEK 811 Installation, Operation And Service Manual

Level cellular tank level monitor
Table of Contents

Advertisement

Installation

Installation Examples

F
. 3
IG
Drilling
If the tank does not contain a suitable positioned
opening at the top of the tank, it will be necessary to
manually drill into the top of the tank.
1. Select a flat area on the top of the tank located
towards the center (F
2. Drill a 1.5 in. bsp hole at the selected area using a
45.5 mm tapping drill.
3. Continue with Activation.
4
. 3).
IG
3A8551E

Advertisement

Table of Contents
loading

Table of Contents