Download Print this page

Unigas C83X Installation Manual page 12

Hide thumbs Also See for C83X:

Advertisement

PART II: INSTALLATION
MOUNTING AND CONNECTING THE BURNER
Transport and storage
ATTENTION! The equipment must be installed in compliance with the regulations in force, following the manufac-
turer's instructions, by qualified personnel. All handling operations must be carried out with appropriate
resources and qualified personnel
ATTENTION: Use intact and correctly dimensioned hoisting equipment, conforms to the local regulations and
health and safety regulations. Do not stand under lifted loads.
If the product must be stored, avoid humid and corrosive places. Observe the temperatures stated in the burner data table at the begin-
ning of this manual. The packages containing the burners must be locked inside the means of transport in such a way as to guarantee
the absence of dangerous movements and avoid any possible damage.
In case of storage, the burners must be stored inside their packaging, in storerooms protected from the weather. Avoid humid or corro-
sive places and respect the temperatures indicated in the burner data table at the beginning of this manual.
Packing
The burners are despatched in wooden crates whose dimensions are:
1330 mm x 820 mm x 600 mm (L x P x H).
Packing cases of this type are affected by humidity and are not suitable for stacking.
The following are placed in each packing case:
burner with detached gas train;
gasket or ceramic fibre plait (according to burner type) to be inserted between the burner
and the boiler;
envelope containing this manual and other documents.
To get rid of the burner's packing, follow the procedures laid down by current laws on disposal
of materials.
Handling the burner
WARNING! The handling operations must be carried out by specialised
operations are not carried out correctly, the residual risk for the burner to overturn and fall down still persists.
To move the burner, use means suitable to support its weight (see paragraph "Technical specifications").
The burner is designed to work positioned according to the picture below. For different installations, please contact the Technical
Department.
PART II: INSTALLATION
SIDE UP
Note: the figure is indicative only.
SIDE DOWN
12
H
L
P
and trained personnel. If these

Advertisement

loading