Ccb Circuit Board Layout - State Water Heaters 120 Series Service Handbook

Commercial / residential gas water heaters
Hide thumbs Also See for 120 Series:
Table of Contents

Advertisement

ccb circuit board layout

1
2
3
4
5
J1
J10
1
3
2
4
Dipswitch Operation:
Along one side of the dipswitch array there are numbers, 1-4. On the other side of the dipswitch
is the word "OPEN." The dipswitches are rocker type switches, if one side of the rocker is down the
other side will be up. Pressing a rocker down on the side of the array labeled "OPEN," opens the switch.
Pressing a rocker down on the side of the array labeled with the numbers 1-4 closes the dipswitch.
CHANGING NUMBER OF IGNITION TRIALS BEFORE LOCK OUT
NOTE: Always turn off power to the water heater before changing dipswitch settings.
Set dipswitch #4 to the open position for 1 trial for ignition before Ignition Failure lock out. Set dipswitch
#4 to the closed position for 3 trials for ignition before Ignition Failure lock out.
CCB (CENTRAL CONTROL BOARD)
1
1
2
2
3
4
J3
4
J2
1 Retry
Use
Ext
Input
Type
Spare
S1 DIPSWITCH
S1 DIPSWITCH DETAIL
1 Retry
Use
Yes
Ext
Input
Type
Tstat
Spare
Figure 41
Servicing should only be performed by a Qualified Service Agent
1
2
J5
15
J6
14
3
13
Retries
Yes
No
Tstat
Vent
Spare
J13
1
5
J15
2
6
3
7
1
4
8
2
3
Retries
No
Vent
Spare
J4
12
9
6
3
11
8
5
2
10
7
4
1
J7
4
3
2
1
J9
J11
J16
41

Advertisement

Table of Contents
loading

Table of Contents