FINISHING COMMISSIONING

The boiler has been factory set, so there
should be no need to adjust any controls.
REPLACE OUTER CASING:
1
Replace outer casing making sure that the
securing points are properly located.
► Press the clip (A) downwards to secure
casing on top.
► Retighten bottom two screws (B).
INSTALLING BOTTOM PANEL:
2 The bottom panel slides onto two ledges
(C) either side of the boiler frame.
► Hold the panel up against the underside
of the boiler and slide towards the rear until
it is fully engaged.
HANDOVER:
► Complete the Benchmark check list.
► Set up the controls and show the user how
to operate all the controls shown in the User
Guide.
► If the appliance is unused and exposed to
freezing conditions; shut off all the mains
supplies and drain the system and boiler.