Bosch WORCESTER GREENSTAR 25CDi Instruction Manual page 45

Wall hung rsf gas-fired condensing combination boiler
Hide thumbs Also See for WORCESTER GREENSTAR 25CDi:
Table of Contents

Advertisement

t^fORCESTER
INSTALLATION & SERVICIN
6 720 611 927b (04/05)
Bosch
roup
INSTRUCTIONS FOR WORCESTER BOSCH
REENSTAR 25CDi/30CDi/35COi/40COi
REPLACEMENT OF PARTS
Access to boiler control
components
► Remove 3 screws (A) and remove
cover from control.
PCB fuse
► Remove fuse (B) from the PCB and
replace.
► There is a spare fuse clipped into the
cover.
Transformer / PCB
► Disconnect all electrical connections
from the control.
► Remove 5 screws (C) retaining the
rear panel of the control and remove
panel.

Advertisement

Table of Contents
loading

Table of Contents