Finishing Commissioning - Bosch Worcester Greenstar Danesmoor 12/18 Installation, Commissioning And Servicing Instruction Manual

Floor standing oil-fired condensing boiler conventional flue & room sealed flue
Hide thumbs Also See for Worcester Greenstar Danesmoor 12/18:
Table of Contents

Advertisement

Commissioning
6.5

Finishing commissioning

1. Pivot the control box (A) up and into the boiler. Secure with screws
(B).
Kitchen system only:
▶ Slide the expansion vessel up and locate the top edge into the
bracket [1] located under the control panel.
▶ Push the expansion vessel in until the bracket on the expansion
vessel aligns with the bracket on the cross member.
▶ Secure with the screw [2] removed earlier.
Fig. 67 Expansion vessel location
2. Locate the top edge of panel (C) onto the supporting ledge (D) and
secure near the top and at the bottom by gently pushing home the
ball studs into the retaining slots (E). Remember always to apply
pressure at the edges of the panels to avoid damage.
3. Locate the top panel (F) onto the rear brackets (G) and press down
to secure the ball stud connections (H). Always apply pressure at the
edges of the boiler panels when securing to avoid accidental damage.
38
1
2
D
B
B
F
A
C
Fig. 68
Handover
▶ Complete the Guarantee Registration Card, Combustion Record and
CD11 or an equivalent commissioning form.
▶ Set up the controls and show the user how to operate all the controls
shown in the User Guide and all system controls.
▶ Where applicable, instruct the customer how to repressurise the
system.
▶ If the appliance is unused and exposed to freezing conditions, shut
off all the mains supplies and drain the system and boiler.
6 720 808218 (2013/10) Danesmoor Kitchen and Kitchen System