Alignment; Door Panel - Sub-Zero Designer Series Installation Manual

Undercounter refrigeration
Hide thumbs Also See for Designer Series:
Table of Contents

Advertisement

Available languages
  • EN

Available languages

  • ENGLISH, page 1
Installation

Alignment

LEVELING
Once the unit is in position, rotate the front legs clockwise
to raise and counterclockwise to lower. Rear height adjust-
ment can be made from the front. Using a Phillips drive,
turn clockwise to raise the unit or counterclockwise to
lower. Use the lowest torque setting when using a power
drill. Do not turn the leveling legs by hand. Refer to the
illustration below.
When the unit is properly leveled, door adjustments are
less likely to be necessary.
IMPORTANT NOTE: Level the unit to the floor, not the
surrounding cabinetry. This could affect the operation of
the unit, such as door closing.
WARNING
To reduce the possibility of the unit tipping forward,
the front leveling legs must be in contact with the
floor.
FRONT
REAR
ADJUSTMENT
ADJUSTMENT
Leveling
ANCHORING
CAUTION
If using a power drill to predrill holes or install
screws, verify the drill chuck does not contact the
units face frame.
Adjust the depth of the unit to fit flush with the surround-
ing cabinetry. Allow for panel thickness. Once aligned,
verify the door opens properly, then install a #8 x 1/2" flat-
decorative head screw in each bracket.
WARNING
To avoid a hazard due to instability of the appliance,
it must be fixed in accordance with the instructions.
Anchoring

Door Panel

Stainless Steel Panel
Stainless steel panels are available through an authorized
Sub-Zero dealer.
Minimum 3 mm reveals are required.
Custom Panel
A custom door panel and handle hardware must be
installed.
A 16 mm minimum to 19 mm maximum thick panel is
required. The panel cannot exceed the maximum panel
weight indicated in the chart below. The depth of each
model is 587 mm. Allow for panel thickness when planning
the finished opening depth.
Minimum 3 mm reveals are required.
PANEL WEIGHT
610 mm Model
Finish all sides of the custom panel. They will be visible
when the door is open.
A D-style handle is recommended. Locate the door handle
near the edge of the panel opposite the hinge and cen-
tered top to bottom. Stainless steel tubular and pro handles
are avail able through an authorized Sub-Zero dealer.
subzero.com | 5
MAX
10 kg

Advertisement

Table of Contents
loading

Table of Contents