Checking Injector Protrusion; Cylinder Heads; Valve Clearance - Kohler LOMBARDINI 25 LD Workshop Manual

Table of Contents

Advertisement

7
77
78
79
- 44 -
Engine assembly

Checking injector protrusion

Before mounting the heads to the cylinders fit the injectors
into their housings and, after having secured them temporarily,
check the protrusion of the nozzles from the head faces (fig.77).
Protrusion S should be:
This value is adjusted by inserting copper washers between the
injectors and the injector supporting faces on the heads (fig. 77).

Cylinder heads

For checking and overhaul of the cylinder heads refer to page
19.
Fit the push rods and oil sealing O-rings on the cover pipes and
proceed to install the cylinder heads with the relative gaskets on
the facing surfaces.
• Make sure that the oil seal rings are correctly seated in the heads
to avoid the risk of oil leaks.
Align the heads using a metal bar or the exhaust manifold
(fig.78).
Following a cross pattern tighten the head nuts (fig.78) in
increments of 1 kgm until you reach the value:

Valve clearance

The clearance between valves and rockers with the engine cold
(fig.79) is:
This clearance is to be adjusted with the pistons at their
respective TDC compression positions.
25 LD 330-2_425-2 Workshop Manual_cod. ED0053031690_1° ed_ rev. 00
1,75 ÷ 2,25 mm
Important
4 kgm (Nm 39,2)
0,15 mm
intake/exhaust

Advertisement

Table of Contents
loading

This manual is also suitable for:

Lombardini 330-2Lombardini 425-2

Table of Contents