22. TRAVEL OPERATIONS
22.8
LOAD HANDLING OPERATION
•
Check that there is no danger of collapse or breakage of the load at the loading point.
•
Check that the loading position is correct.
•
Never push the load with the fork tips.
22.8.1
LOADING
1. Stop slowly when reaching the stacking location.
2. Tilt the mast forward until it is vertical.
3. Raise the load to 2 - 4 in. (5 - 10 cm) above the stacking point.
4. Drive slowly forward.
3-38