Download Print this page

Mercia Garden Products 01SHPWOR1010DDOW-V1 General Instructions Manual

Advertisement

Quick Links

General Instructions
Overlap
Shiplap
Cladding
Cladding
01SHPWOR1010DDOW-V1
10x10 Shiplap Workshop with double doors, opening windows, T & G floor and roof.
01SHPWOR1210DDOW-V1
12x10 Shiplap Workshop with double doors, opening windows, T & G floor and roof.
01SHPWOR1610DDOW-V1
16x10 Shiplap Workshop with double doors, opening windows, T & G floor and roof.
01SHPWOR2010DDOW-V1
20x10 Shiplap Workshop with double doors, opening windows, T & G floor and roof.
14/01/2014
Fixed
Opening
Windows
Windows
Please retain product label and instructions for future reference
N/A
No
Solid Sheet
Floor
Windows
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand
(not supplied) including a Phillips screwdriver, Stanley knife, wood saw,
step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather
conditions. For the duration of heavy or extended periods of rain, swelling of the
wood panels may occur. Warping of the wood may also occur during excessive
dry spells due to an interior moisture loss. Unfortunately, these processes cannot
be avoided but can be helped. It is suggested that the outdoor building is
sprayed with water during extended periods of warm sunshine and sheltered as
much as possible during rain or snow.
Our buildings are pre treated with a water based treatment**; this only helps to
protect the product during transit and for upto 3 months against mould. To
validate your guarantee and ensure longevity of the product, it is ESSENTIAL the
building is treated with a wood preserver within the rst three months of
assembly and thereafter in accordance with the manufactures recommenda-
tions. Care must be taken to ensure the product is placed on a suitable base.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer
to diagrams for the base dimensions, The base should be slightly smaller than
the external measurement of the building, i.e. The cladding should overlap the
base, creating a run o for water. It is also recommended that the oor be at
least 25mm above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the
highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot
accept responsibility for your safety whilst erecting or
using this product.
Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN
Refer to the instructions pages for you speci c product code
T&G Floor
Solid Sheet
Roof
x2
All building's should be erected by two
adults
For ease of assembly, you must pilot
drill all screw holes and ensure all
screw heads are countersunk.
2mm Drill bit
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces
of the timber. You are strongly advised
to wear gloves when working with or
handling rough sawn timer.
For Assistance Please
Contact Customer Care on
01636 880514
**Protim Fentex E5**
Biocidal Product Regulation (EU 528/2012) Article 58 Information
Protim Fentex E2 preserved wood is a "treated article" which incorporates biocidal products.
Wood correctly preserved with Protim Fentex E2 is protected against mould in storage.
Contains: IPBC (3-iodo-2-propynyl-N-butyl carbamate) and propiconazole.
Wear gloves when handling freshly treated wood.
Avoid breathing dust when cutting treated or untreated wood.
Dispose of o -cuts responsibly – do not burn.
www.merciagardenproducts.co.uk
T&G Roof
P 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the 01SHPWOR1010DDOW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01SHPWOR1010DDOW-V1

  • Page 1 Dispose of o -cuts responsibly – do not burn. using this product. Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN www.merciagardenproducts.co.uk Refer to the instructions pages for you speci c product code...
  • Page 2: Pre-Assembly

    H=220cm W=140cm L=130cm 01SHPWOR1010DDOW-V1 Please retain product label and instructions for future reference Overall Dimensions: Nail Bag 30mm Screw x 85 Length = 3114mm Felt Tacks x 170 Width = 3179mm 40mm Screw x 106 16mm Screws x 12 Height = 2485mm...
  • Page 3 Step 2 Step 3 Plain Gable Assembly Lay the Front Gable Left next to the Front Lay the Back Left Gable and Back Right Top Gable, ensure they are level at the top Gable on a level floor place them next to then fix together using 2x50mm screws.
  • Page 4 Step 4 Step 5 Place floor on firm and level base, ensure Fix the corners with 50mm base has suitable drainage free from areas screws as shown in diagram. where water can collect. (See front page on base requirements). Do not secure the building to the floor until the roof is fitted.
  • Page 5 Step 9 Step 7 Fit the Door Gable Rail between the Fix the remaining plain side with Front Gable Left and Right. Fix to the 50mm screws as shown in diagram. floor using 3x50mm screws. Ensure screws line up with the framing. 3x50mm Screws 3x50mm Screws 50mm...
  • Page 6 Step 11 Step 10 Place a Truss central to where two Measure the height of the panels join. Align the top of the doors and cut two trims to truss with the top of the sides as match. Fix the strips onto the shown in the diagram.
  • Page 7 Step 13 Step 12 Place the second roof sheet Place a roof sheet ontop of the ontop of the truss and ensure plain gable and truss making sure that it butts up to the one the roof sheet sits into the gables and x using 40mm screws.
  • Page 8 Step 16 Step 14 Cut four strips of felt and place Once the roof is fixed onto the roof. See below for attatch the building to the sizes. floor with 50 mm screws. Place the felt flat onto the roof 36 x 50mm Screws in the order that is stated on the diagram below.
  • Page 9 Step 18 Step 17 Fit the fascias to the roof Fit the cover trims to the over the felt and secure in building and secure in place place with 40mm screws as with 40mm screws as shown. shown. Fit the Plain Gable Strip where the two back gables Pre drill to avoid splitting.
  • Page 10 Step 19 Step 20 *SCREW COUNT PER WINDOW Place the cover strip 11mm above the First line up the door blocks window gap in the window panel and on top of the framing of the fix with 3x30mm screws per strip. doors.
  • Page 11 Step 22 Step 21 Rim lock Fix the casement stay to the opening window then align Rim lock fixing the fixings onto the window Screws provided with lock panel frame. Ensure the case- Do not over tighten the screws Fig 1. (internal view) ment stay fits into fixings when Place the lock onto internal closed before screwing them...
  • Page 12: After Treatment

    AFTER TREATMENT: score around protective cover on glazing and carefuly peel covering back It is ESSENTIAL that you apply wood treatment immediately after the building has been assembled. P 12...