Download Print this page

Advertisement

Quick Links

General Instructions
10X10 OVERLAP APEX SHED
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY
- Check the pack and make sure you have all the parts listed.
- When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips
screwdriver, Stanley knife, wood saw, step ladder and drill with 2mm bit.
- Ensure there is plenty of space and a clean dry area for assembly.
TIMBER
As with all natural materials, timber can be a ected during various weather conditions. For the duration of
heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also
occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be
avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended
periods of warm sunshine and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to
prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof
treatment to prevent water ingress
Pressure Treated buildings - Require a waterproof treatment to prevent water ingress
Log Cabins - Are supplied untreated and require a preservative and waterproo ng treatment.
BUILDING A BASE
When thinking about where the building and base is going to be constructed:
Ensure that there will be access to all sides for maintenance work and annual
treatment.
Ensure the base is level and is built on rm ground, to prevent distortion. Refer to diagrams for the base
dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The
cladding should overlap the base, creating a run o for water. It is also recommended that the oor be at least
25mm above the surrounding ground level to avoid ooding.
TYPES OF BASE
- Concrete 75mm laid on top of 75mm hard-core.
- Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens
products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting
or using this product.
Refer to the instructions pages for you speci c product code
Please retain product label and instructions for future reference
x2
All building's should be
erected by two adults
For ease of assembly, you
MUST pilot drill all screw
holes and ensure all screw
heads are countersunk.
2mm Drill bit
**Protim Aquatan T5 (621)**
Your building has been treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct
application of Aquatan solution and then allowed to dry.
Aquatan is a decorative nish to colour the wood, which is applied industrially to timber fence panels and
garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl
sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.
For assistance please contact customer care on: 01636 880514
Mercia Garden Products Limited,
Sutton On Trent,
Newark,
Nottinghamshire,
NG23 6QN
www.merciagardenproducts.co.uk
Winter = High Moisture = Expansion
Summer = Low Moisture = Contraction
CAUTION
Every e ort has been made during the
manufacturing process to eliminate the
prospect of splinters on rough surfaces of the
timber. You are strongly advised to wear gloves
when working with or handling rough sawn
timber.

Advertisement

loading
Need help?

Need help?

Do you have a question about the 01OVLPA1010DDFW-V1 and is the answer not in the manual?

Questions and answers

Summary of Contents for Mercia Garden Products 01OVLPA1010DDFW-V1

  • Page 1 - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand. Mercia Garden Products Limited, Sutton On Trent, Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens...
  • Page 2 H=220cm W=140cm L=130cm 01OVLPA1010DDFW-V1 & 01OVLPA1010DDNW-V1 Please retain product label and instructions for future reference Overall Dimensions: Length = 3028mm Ridge Bar - 27x70x1462mm QTY 2 Width = 3095mm F2770-1462mm Height = 2257mm Finial QTY 2 Truss Block - 44x44x140mm QTY 2...
  • Page 3: Pre-Assembly

    Please retain product label and instructions for future reference Pre Assembly Step 2 Remove transportation Lay the Front Gable Left next to the Front blocks from the bottom of Top Gable, ensure they are level at the top each panel before then x together using 2x50mm screws.
  • Page 4 Please retain product label and instructions for future reference Step 3 Step 5 Plain Gable Assembly Lay the Back Left Gable and Back Right Fix another two oor panels using Gable on a level oor place them next to the oor blocks provided. each other, ensure they are level at the top and bottom then x together using Place the oor blocks in between...
  • Page 5 Please retain product label and instructions for future reference Please retain product label and instructions for future reference Step 6 Step 8 Fix the remaining window side at Fix the corners with 50mm the corners with 50mm screws as screws as shown in diagram. shown in diagram.
  • Page 6 Please retain product label and instructions for future reference Step 11 Step 9 Fix the T Hinges onto the Fix the Door Gable (refer to steps 1 doors and door gable as and 2 if you have not already shown. Ensure that the screws assembled this) at the corners with go through the cladding and 50mm screws as shown in diagram.
  • Page 7 Please retain product label and instructions for future reference Step 12 Step 13 70mm screw Place a Truss central to where two panels join. Align the top of the Place the two ridge bars in between truss with the top of the sides as Pre drill the front and back panels.
  • Page 8 Please retain product label and instructions for future reference Step 14 Step 15 Fix the eaves frame to the Fix the remaining eaves frames roof sheet using 4x30mm to the remaining roof sheets screws for each sheet. using 4x30mm screws per sheet. 8x30mm Screws Place the roof sheet ontop of Place two roof sheets ontop of the...
  • Page 9 Please retain product label and instructions for future reference Step 16 Step 17 Once the roof is xed Cut four strips of felt and place attatch the building to the onto the roof. See below for sizes. oor with 50 mm screws. 10x10 - 24 x 50mm Screws Place the felt at onto the roof 15x10 - 40 x 50mm Screws...
  • Page 10 Please retain product label and instructions for future reference Step 18 Step 19 Fit the cover trims to the Attatch faisca’s to the building and secure in place roof leaving a slight with 40mm screws as overhang at the top. shown.
  • Page 11 Please retain product label and instructions for future reference Step 20 Step 21 Fix the door strips to the First line up the door blocks Use 4x30mm Screws to x Attatch the turn button to master door using 5x30mm 20mm on top of the framing of the each beading strip onto the the top and bottom door...
  • Page 12: After Treatment

    Please retain product label and instructions for future reference Step 22 It is ESSENTIAL that you apply wood treatment immediately after the building 30mm Fix the window strips to the two screw Pre drill has been assembled. hole pieces of framing that sit alongside the outside edges of the window with 3x30mm screws for each strip.

This manual is also suitable for:

01ovlpa1010ddnw-v101ovlpa1010ddfw-v1-nw