Testing functionality by secondary injection
10.4.1.1

Function revision history

Document
revision
A
B
C
D
E
F
G
H
10.4.1.2

Activating ZCVPSOF externally

1.
Set AutoInitMode to DLD disabled and Mode to Impedance.
2.
Activate the switch onto fault BC input.
During normal operating conditions, the BC input is de-energized.
3.
Apply a two-phase fault condition corresponding to a fault at approximately 45% of the line or
with impedance at 50% of the used zone setting and current greater than 30% of IBase.
The ZACC input is activated.
4.
Check that the TRIP output, external signals and indication are obtained. The TRIP output will
be obtained tSOTF after the BC input is activated.
10.4.1.3

Initiating ZCVPSOF automatically and setting mode to impedance

1.
Set AutoInitMode to Voltage and Mode to Impedance.
2.
Deactivate the switch onto fault BC input.
3.
Set the current and voltage inputs to lower than IPh< and UPh< for at least tDuration.
4.
Apply a two-phase fault condition corresponding to a fault at approximately 45% of the line or
with impedance at 50% of the used zone setting and current greater than 30% of IBase.
The ZACC input is activated.
5.
Check that the correct TRIP output, external signals and indication are obtained after 15 ms
from the ZACC input activation.
10.4.1.4

Initiating ZCVPSOF automatically and setting mode to UILevel

1.
Set AutoInitMode to Voltage and Mode to UILevel.
2.
Deactivate the switch onto fault BC input.
3.
Set the current and voltage inputs to lower than IPh< and UPh< for at least tDuration.
4.
Apply the two-phase currents in such a way that the magnitudes are greater than IPh< and the
two-phase voltages in such a way that the magnitudes are lower than UPh< at least for the
duration of the tDuration setting.
5.
Check that the correct TRIP output, external signals and indication are obtained.
The timing of the TRIP output depends on the tDuration setting and the distance protection
release of the ZACC input signal.
72
Product
History
revision
2.2.1
-
2.2.1
-
2.2.2
-
2.2.3
-
2.2.3
-
2.2.4
-
2.2.4
Updated technical data for setting parameters tDuration, tDLD and tOperate.
2.2.5
-
If ZACC comes before the elapse of tDuration, TRIP will be activated tDuration+15 ms
after UPh and IPh changes are done.
If tDuration elapses before the ZACC input signal activates, TRIP will be activated 15 ms
after the ZACC activation.
© 2017 - 2021 Hitachi Power Grids. All rights reserved
1MRK 506 377-UEN Rev. K
GUID-A7F84AD6-F164-491B-B25E-D3BB002E1BDA v3
M13850-14 v8
M13850-27 v8
GUID-E83E1B3D-026C-48DB-BB9B-43C6597DE5DB v5
Railway application RER670
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rer670

Table of Contents