Section 10
Testing functionality by secondary injection
10.12.8
Function revision history
Document
revision
C
D
E
F
G
H
J
K
L
M
N
P
Document
revision
C
D
E
F
G
H
J
K
Document
revision
C
D
E
F
G
H
J
K
10.12.9
Voltage harmonic monitoring VHMMHAN
Prepare the IED for verification of settings outlined in Section
152
Product
History
revision
2.2.2
-
2.2.2
-
2.2.2
-
2.2.3
-
2.2.3
Logic has been changed for alarm blocking. The alarm outputs can be blocked when
BLKALM or BLOCK input is activated.
2.2.3
-
2.2.3
-
2.2.4
-
2.2.4
-
2.2.4
-
2.2.4
-
2.2.5
Updated monitoring till 9
monitoring till 5
Product
History
revision
2.2.2
-
2.2.3
Logic has been changed for alarm blocking. The alarm outputs can be blocked when
BLKALM or BLOCK input is activated.
2.2.3
-
2.2.4
-
2.2.4
-
2.2.4
-
2.2.4
-
2.2.5
Updated monitoring till 9
monitoring till 5
Product
History
revision
2.2.2
-
2.2.3
Logic has been changed for alarm blocking. The alarm outputs can be blocked when
BLKALM or BLOCK input is activated.
2.2.3
-
2.2.4
-
2.2.4
-
2.2.4
-
2.2.4
-
2.2.5
Updated monitoring till 9
monitoring till 5
© 2017 - 2021 Hitachi Power Grids. All rights reserved
th
order voltage harmonics. Refer to document revision N for
th
order voltage harmonics.
th
order voltage harmonics. Refer to document revision J for
th
order voltage harmonics.
th
order voltage harmonics. Refer to document revision J for
th
order voltage harmonics.
"Preparing the IED to verify
1MRK 506 377-UEN Rev. K
GUID-82F4CC19-1753-4AF9-88E4-B29B60C851FA v1
GUID-C4E8C37F-0266-44DA-B292-3565C5BD49D0 v1
GUID-804F309E-B02F-4F6B-B0FC-2C7AE3F12DBA v2
settings".
Railway application RER670
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Relion rer670

Table of Contents