Closed Position Stop Plate Installation - Mighty Mule FM500 Installation Manual

Table of Contents

Advertisement

Push-to-Open Installation
Mounting Push-to-Open Opener to Gate
Your Property
12
T
Attach gate bracket assembly to gate cross support.
14
Check for level. Adjust post bracket if necessary.

Closed Position Stop Plate Installation

1
Fully open gate. Attach gate stop with one of the following:
• U-bolts—tube and chain link gates (Not included)
• Wood/lag screws—flat aluminum/wood supports (Not included).
Do not tighten.
R
Y
S
J
13
Attach and secure opener assembly to brackets.
15
Remove bolt excess length on post and gate bracket with
hacksaw.
2
1
Position gate stop with gate CLOSED to fence post. Tighten
fasteners. Cut off excess bolt length.
18
2
1

Advertisement

Table of Contents
loading

Table of Contents