Pump
Installation
Installation Skill Requirements:
The installation of a TRST basin
system is a specialized skill, which
requires individuals with a basic
understanding of excavating, pipe
fitting, and electrical wiring.
Hydromatic
cannot
responsibility
for
or
damage
resulting
inexperienced or undersupervised
laborers.
These instructions are
meant only to be an installation
guide;
therefore,
conditions not covered in these
instructions rely on the experience
and mechanical aptitude of those
installing the system.
Grinder Pump Attachments:
Step 1
Attach the stainless
bracket to bottom of the pump
with two bolts and lock washers
provided. See Figure 1.
Figure 1
Step 2
Apply pipe thread sealant to
discharge piping threads and screw
assembly into the pump discharge.
For
vertical
systems, tighten piping until a
measurable distance of 23-3/4"
±1/8" from the floor to the center
of the ball check valve discharge
diaphragm
See Figure 2.
assume
problems
from
installation
steel foot
Step 3
Install the stainless steel lifting
bail to pump with two bolts
and two lock washers provided.
Position the lifting bail with
mounting tabs directed toward the
ball check valve as shown.
See Figure 3.
pump
discharge
hole
is
achieved.
23-5/8"
to
23-7/8"
Figure 2
Figure 3
Step 4
Attach lifting chain, cable or rope
as supplied to the lifting bail
shackle. Tighten threaded shackle
pin with pliers.
WARNING: To reduce risk of
electric shock, do not connect
conduit to pump.
Excavation :
Step 1
Determine appropriate excavation
based on size of the basin, desired
entrance point of the influent line,
and entrance of power connection.
Step 2
Obtain proper backfill material.
The backfill material provides
as much as 90% of the basin's
support under certain stress
conditions. The installer must be
positive that
correct bed and
backfill materials are utilized per
instructions as follows:
A. Clean and free flowing gravel
with particle size not less than
1/8" nor more than 3/4" in
diameter. Use this description
when ordering or specifying
as
material
varies
geographical location. This
material is commonly known
as "pea gravel".
B. Stone or gravel crushings with
angular particle size of not
less than 1/8", no more than
1/2" diameter, washed and
free flowing, is acceptable as
an alternative material.
CAUTION:
In
conditions the backfill must be
dry and free of ice. Do not use
other backfill materials. The
basin warranty is automatically
void if materials other than the
recommended bed and backfill
materials are used.