Installation

4.1

Unpacking

4.1.1

Unpacking of the valve

a) Open wooden case
b) Remove wooden bars inside
c) On the valve you will find M30 eye bolts. Lift the valve out of the wooden box by attaching the lifting
strips onto these M30 eye-bolts.
8/26
INSTALLATION
Unqualified personnel
Inappropriate handling may cause serious injury or property damage.
Only qualified personnel are allowed to carry out the described work.
Heavy weight
Physical overstraining.
Use a crane to lift the product.
• Make sure that the supplied products are in accordance with your order.
• Inspect the quality of the supplied products visually. If it does not meet
your requirements, please contact VAT immediately.
• Store the original packaging material. It may be useful if products must be
returned to VAT.
The valve can be lifted only at the five eyebolt threats;
see «Figure 4-1» below.
Edition 2018-08-22
WARNING
WARNING
Series 191 / 192
600246EA