Operation - AEMC 6240 User Manual

Spring loaded 25 a kelvin probes
Hide thumbs Also See for 6240:
Table of Contents

Advertisement

Available languages

Available languages

■ Connect the two spring loaded 25 A test probes to the four terminals of the
instrument.
■ Loosen the nuts on the binding posts. Insert the spaded lugs while carefully
connecting the red leads to the voltage terminals (P). Then, tighten the nut.
■ If the instrument has safety terminals, unscrew the spaded lugs to make the
connection.
For details of the measurement configuration, technical specifications and error
messages, refer to the user manuals for the meters being used.
Spring Loaded 25 A Probes

3. OPERATION

9

Advertisement

Table of Contents
loading

This manual is also suitable for:

6255

Table of Contents