Miele PDR 910 G Quick Start Manual page 35

Commercial tumble dryer
Hide thumbs Also See for PDR 910 G:
Table of Contents

Advertisement

Available languages

Available languages

When connecting to the mains electricity supply, phase L of the
tumble dryer must be connected to phase L of the mains. The
neutral conductor N of the tumble dryer must be connected to the
neutral conductor N of the mains.
If the connections are mixed up, the flame detection function will
not work. When heating, the tumble dryer issues fault mes-
sage .
The plug connector or isolator switch should be easily accessible at
all times.
 If the tumble dryer is disconnected from the electricity supply,
the isolator must be lockable or the point of disconnection must be
monitored at all times.
New connections, modifications to the system or servicing of the
earthing conductor, (including determining the correct fuse rating),
must only be carried out by a qualified electrician.
If more than one voltage is specified on the data plate, the tumble
dryer can be converted for connection to the relevant input voltage.
This conversion must be performed by the Miele Customer Service
Department or by an authorised dealer. During the conversion, the
wiring instructions given on the wiring diagram must be followed.
If it is necessary to install a residual current device (RCD) in ac-
cordance with local regulations, a residual current device type B
(sensitive to universal current) must be used.
en - Installation
35

Advertisement

Table of Contents
loading

Table of Contents