Time Left - Miele PDR 910 G Quick Start Manual

Commercial tumble dryer
Hide thumbs Also See for PDR 910 G:
Table of Contents

Advertisement

Available languages

Available languages

en - Changing the programme sequence
Adding laundry during ongoing Delay start period
You can open the door to add or remove laundry.
- All programme settings will be saved.
- You can change the drying level, if required.
Open the door.
Add or remove laundry.
Close the door.
Touch the Start/Stop sensor control so that the Delay start period
continues.

Time left

Altering the programme sequence can cause the programme duration
shown in the display to be adjusted.
27

Advertisement

Table of Contents
loading

Table of Contents