Download Print this page

HOKLARTHERM Livingten Assembly Instructions Manual page 5

Advertisement

Note: all bolt heads and connectors can be inserted through the insertion points in the
channels. Slots approx. 11.5 x 50 mm long or holes diameter 11.5 mm - As a rule of
thumb, these possibilities are provided approx. 150mm from the respective profile end.
{picture}
The door gable is mounted in a similar way with the long upright center profile missing
here (because of the door). Here the door gable crossbar has a factory-installed reinforcement
profile (track) for the sliding door and therefore differs from the rear wall version.
In the middle of the door passage, a short version of the support bar is mounted and screwed
on. The greenhouse ridge support is also placed/inserted here.
Sketches
6. Roofing ceremony - Placement of the ridge profile
The ridge is placed on the center upright bar of the back gable and front gable by using plastic
pins that are already factory-installed.
The necessary roof bar "connectors" are already screwed onto the greenhouse ridge in the
correct position, specifying the position/distance of the struts.
{picture}
7. Inserting the roof profiles
Now all roof profiles can be inserted. The positions are determined by the "connectors" already
pre-mounted in the roof ridge profile. The roof profiles should be first inserted into the ridge
profile and then slid into position on the eaves profile. Possibly push the eaves profile slightly
outwards so that it "snaps in".
The roof profiles all have holes for inserting the statically necessary tension braces –
- 2 x flat 40x4 - - 2.000 mm long. – each as a pair –
This pair of tension braces is installed in the greenhouse L 5 = 5 panes in the 2nd or 3rd pair
of roof profiles. Mount with M6 x 55 screws with U-washers and cap nuts. A M6 x 55 screw is
also inserted in the middle – use plastic bushing 10/6 x 40 mm washer and cap nut as a spacer.

Advertisement

loading