Summary of Contents for HOKLARTHERM Riga III Series
Page 1
A L U M I N U M O n io n s h a p e d g r e e n h o u s e - R ig a - Tec h n ic a l In forma tion S u bjec t to C h a n g e Assembly Instructions R IG A S eries II, III, IV November 2004...
Page 2
Dear garden friend, Congratulations on the purchase of a RIGA greenhouse from Hoklartherm, Germany. You w ill find the assembly of the RIGA greenhouse to be q uick and easy if you carefully follow these Assembly Instructions. The assembly req uires only tw o people, but it w ill go q uick er if you have access to a 3 rd person w ho can help from time to time - this person does not need to be especially strong or handy.
Page 3
Getting Started 1) The assembly has to be executed by at least two people - a 3rd person to help out from time-to-time is recommended! 2) W ork cautiously, with the proper tools. Make sure that the stepladder’s footing is secure! 3) W e recommend that you work with gloves (although all of the edges have been filed, it is always possible for you to be cut when handling either the aluminum or polycarbonate parts).
Page 4
Basic Frame - Aluminum P arts and q uantity: Front & Back Floor Profile Note: Windows and Door frame parts are Side-Floor Profile taped together into their own indiv idual bundles. Roof Beam Profile Front & Back Crossbars Door Support - right side Detail A = Floor Profile (page 7) with 8 holes Door Support - left side...
Page 5
Bag(s) with Accessories for Riga 2 S/2 , 3 S/3 and Riga 4 S/4 Please check - according to table - if complete. designation size no. of pieces no. of pieces no. of pieces Riga 2 S/2 Riga 3S/3 Riga 4 S/4 clamping plate hexagon bolt M6 x 16...
Page 6
Suggestion Before you begin - read all these instructions to become familiar with each step of the assembly process. You might decide that you find it easier to complete the assembly process in a different sequence. Several sequences are possible. For ex ample, some people may prefer to build all of the greenhouse frame first and then insert the Glazing Panels, while others may prefer to interchange these steps.
Page 7
Detail A Step 6: Connection of the front section to the Side Floor Profiles: Now attach both Side-Floor Profiles (#1.2) to the front section by inserting the aluminum-corner connectors with recessed screws while at the same time sliding the Curved Corner Profiles (#2.1) into the Side-Floor Profiles.
Page 8
Step 10: Mounting of Roof Glazing Panels: Guiding groove of the window At this time select one of the largest sheets of the Glazing Panels and remove the protective film, and insert it into the channel of a Curved Corner Profile (start either on the right or left side of the greenhouse).
Page 9
Step 13: Place rest of Roof Glazing Panels: Now place the rest of the large Glazing Panels (remember that if you are installing a second Roof Window) you must place this in one of the other sections as you prefer). When you have completed the last section attach the back wall.
Page 10
Step 17: Assembly of Lateral Supports #2.0: If you bought the optional shelving (shelving without legs - specially designed for the RIGA greenhouses) - refer to page 13 for further instuctions. If not: Lay 2 of the Lateral Supports (#2.0) on top of the Front and Back Crossbars one on each side against the Curved Profiles, attach to the Curved Profiles using the lowest Hexagon Bolts you put in the Curved Profile channels, tighten...
Page 11
H elpful H int: Depending on where you might have laid down the Floor Profiles you might find that dirt/ sand has already entered the little channel on the bottom side of the Floor Profiles into which the Foundation Frame pieces are to be hooked. Two solutions: Either use a brush with very fine bristles and try to wipe out the dirt, and/or carefully slide the Foundation Frame, starting from one end all the way down the channel of the Floor Profiles, to push the dirt out.
Page 12
Parts list for skylight Pos. designation length number PVC-angle bracket 2.7“ x 1.1“ x 0.4“ Alu-angle connection with recessed screw 1.2“ x 1.2“ x 0.4“ Skylight (roof window) cross-rail 41“ Skylight Side Bar 24.8“ Y-seal 11.5 ft. milling to have it push into the ridge -top- Pos.
Page 13
Mounting of the skylight (roof window): Slide the narrow circular channel sticking out of the top Skylight Profile (#5.0) of the fully assembled roof window (see Ill. 3, page 8) into the wider circular channel on top of the Roof Beam.
Page 14
designation profile Pos. length number Aluminum Corner Connectors with a hole on side 2“ x 2“ x 0.4“ 1.1.0 Connecting screw 3,5 x 32 (0.1“ x 1.3“) 1.1.1 Connecting screw 4,8 x 50 (0.2“ x 2.0“) Upper door cross-rail 30.5“ Upper Section Right Vertical Door Support with holes for hinges 46.3“...
Page 15
door rung Ill. 1: Seal 2 mm Door glazing Both Doors: Sealer & Glazing: Then press the narrow seal into the channel on the outside of the profiles with the lip pointing to the inside. See illustration at bottom of last page and GHD-seal above.
Page 16
Detail C Mounting of the Accessories Mounting of the door and window hinges: (see illustration on the right).The bottom parts of the hinges are to be attached to the right outer door and rear window frames using the screws 4.8 x 25 (0.2“ x 1“ long) - into the appropriate holes.
Page 17
Door Holder: The Door Holder - white and made out of two pieces (male and female) - is used to keep the door open in a fixed position. Place the Holder at the top right-hand corner of the door. See picture above.
Page 18
ill.1 ill. 4 ill.2 ill. 3 ill. 5 Placing the Lateral Supports: If you have not already done so: Attach 2 Lateral Support #2.0 (full length of greenhouses) on both sides using the Hexagon Bolts. Place in each of the Curved Profiles. One lays on top of the Front and Back Wall Crossbars (#1.4) the other goes at head height - but below the Roof Window.
Page 19
Mounting of Lower Shelf (table without legs) (optional accessory) Step 1: (If top shelf already exists, start with step 2) Place an Eye-Hook (Ill.1) in all the Center Curved Profiles. Step 2: Slide as many Hexagon Bolts into the bottom channel of the Lateral Support (which is placed against the greenhouse side wall) as you have Cross-struts.
Page 20
Hoklartherm - enjoy the fruits of your labor! Please contact your supplier for information about Special Accessories for your RIGA greenhouse. If you wish to see what other products Hoklartherm manufactures visit its website: www.hoklartherm.de In case of problems during the assembly process or questions regarding the RIGA warranty, contact the U.S.
Need help?
Do you have a question about the Riga III Series and is the answer not in the manual?
Questions and answers