Please check before inserting the panes if possibly protruding pane edge seals are
sticking out and if so remove them – a precise glass dimension is necessary. This
applies to all panes!
Please proceed in the following order: Two panes at a corner profile (each side of the
corner). Push them all the way up against the corner profile. This already stabilizes the
construction in all directions.
{picture}
Then set all other panes (only the panes, not the bars). Insert panes as far up into the eaves
profile so that it slides over the edge of the soil profile into the groove.
– Please ensure that the panes stand on the already factory-glued glazing blocks at the bottom!
Since the eave profile sags a little in the middle, lift the profile slightly in order to insert the glass
panels properly.
{picture}
In order to be able to insert all the glass panels, slide them as far to the side as possible (some
to the left, some to the right). Push together tightly (without bars) so you have a gap in the
middle.
This gap width must be checked! According to the following table:
Greenhouse length
5 panes
6 panes
7 panes
Why? The ISO safety glass panes have production tolerances that must be taken into account.
Should the gap exceed the given upper value, glazing blocks must be inserted into the
construction. Start with both top and bottom in the upright corner profile. If this is not
sufficient, also glue glazing blocks into one or the other bar in the same way, so that the
difference is compensated for and the given gap dimension is achieved. This results in
the statically necessary "pane effect" - The construction should no longer be able to be
moved. –absolutely safe e.g., against wind pressure and suction. -
Gap size
62 – 65 mm
77 - 80 mm
92 – 95 mm