Overlap Reverse
Apex Shed 6' x 4'
IMPORTANT, RETAIN FOR FUTURE REFERENCE; READ
CAREFULLY
This building is pre-treated with a factory base coat for
protection during storage and transit. We recommend that
you treat your new building as soon as possible after
assembly using a wood preservative treatment. Apply in
accordance with the manufacturers instructions.
- This product must be built on a solid level base.
- The roof of this building is not a load bearing structure.
- Please keep all plastic bags and small parts away from
children.
- Timber is a natural material. It will shrink and swell as a
result of varying moisture content.
- Due to the nature of the material the doors may need some
trimming for a neater fit.
0333 7777 089
Technical Help line:
8.30am and 5.00pm
Monday to Friday.
Please check all parts prior to assembly
Assembly of damaged parts may be deemed to be
acceptance and this may affect the remedies you are entitled
to.
If the product is not constructed in accordance with the
instructions, or is altered in anyway (e.g. painted), the
manufacturer cannot be held liable for any resulting damage.
Not to Scale
Fixing Pack (OPA46FP)
This fixing pack is used for several products.
There may be additional fixings.
Hasp &
Staple
Flush Hinge
Qty 2
10mm Felt tacks
Qty 100
REQUIRED TOOLS :
(NOT SUPPLIED)
SHARP KNIFE
SCISSORS
POZI DRIVE
FLAT HEAD
TAPE MEASURE
HAMMER
SCREWDRIVER
SCREWDRIVER
Important :
Assembly of this
shed requires a
Must Pre-drill for
minimum of two
each screw used.
adults.
ODR64 PARTS LIST
C
A
B
ODR4PE
ODR6BP
ODR6FP
PLAIN END
PLAIN SIDE
FRONT PANEL
H
J
45281753
1753mm BATTEN QTY 1
N
PLASTIC GLAZING STRIP QTY 4
B
1 1
C
A
B
Place the panels on top of the floor. Make sure that all the panels are tight and flush before
fixing them to each other using 3x50mm screws.
Make sure that the panels are sitting flush before fixing to the floor using 50mm screws, making
sure that all of the screws are positioned so that they screw into the bearers underneath.
3x50mm screws for the plain and window sides.
2x50mm screws for the plain and door ends.
3
J L
Place the corner strips so that they cover the joins
between the panels. Fix each in place using 3 x 30mm
screws
D
F
SFL46
SDRDT
FLOOR
DOOR
K
L
51120810PAII58DT
810mm BARGE BOARD QTY 4
O
84996
Top View
2
B
D
C
O
B
a
Fix the 20 x 1695mm strip to the side
of the door frame so that it is tight
with the cladding and flush with the
frame. Use 3 x 30mm screws.
4
You may need to cut the strips
(USE SCISSORS)
G
H
17917658
PCWIN1
ROOF SHEET
GLAZING
QTY 2
QTY 1
M
44161798DT
1798mm C/STRIP QTY 4
20121695PDT
20 x1695mm STRIP QTY 1
A
F
b
Place the hinge against the inside of the door frame and
position the large section of the hinge so that it is flush
with the inside of the framing as shown. Fix with 25mm
screws.
Open the hinge and fix the smaller section to the door
framing. Again make sure that the hinge is flush and that
the holes are positioned so that the 25mm screws locate
correctly into the batten.
Window
Outside
of Shed
N
H
Lip
Board
1. Place the window from the outside of shed, into window opening, so that the bubble faces inside
the shed. Lip at bottom of window must overlap board at bottom of window opening.
2. Place the plastic strips on the left, right, and bottom of window so that one side butts up against
the cladding.
3.Fix the plastic strips using 2 x security screws for each strip.
Attention:
Take care when placing
to size.
the screws. These can
not be backed out.
I
FIN20010512DTR
Finial
QTY 2
85052 QTY 1
37281791
1791mm BATTEN QTY 2
Inside
of Shed
Cill
Issue 0318
Need help?
Do you have a question about the ODR64 and is the answer not in the manual?
Questions and answers