Details Of Procedure For Radio Control Operation - Komatsu D375A-5 Operation & Maintenance Manual

Hide thumbs Also See for D375A-5:
Table of Contents

Advertisement

OPERATION
10.3 DETAILS OF PROCEDURE FOR RADIO CONTROL OPERA-
TION
10.3.1 CHECKS BEFORE STARTING
Before operating the radio control, carry out the checks before starting for the base machine.
For details of the checks before starting for the base machine, see the separate Operation and Maintenance Man-
ual for the standard machine.
Check the following items on the radio control unit.
Are all the connectors for the receiver unit and controllers securely installed?
Are there any loose bolts?
Are the reception antenna, mounting bracket, and connectors securely installed?
Is there any leakage of oil from the connections of the hoses and work equipment PPC unit?
Do the transmitter power lamps work (flash) properly? (Is the battery is fully charged?)
Can the horn can be sounded using the radio control operation?
Are the connectors and wiring harnesses related to the external power supply system securely installed?
Are there any abnormalities in the connectors and wiring harnesses related to the external power supply
system (wiring insulation, etc.)?
10. HANDLING RADIO CONTROL
3-19

Advertisement

Table of Contents
loading

Table of Contents