Equipment Checklist; Package Contents; Optional Rack-Mounting Equipment - SMC Networks SMC6248M Installation Manual

Tigerstack 10/100 48-port 10/100mbps stackable managed switch
Hide thumbs Also See for SMC6248M:
Table of Contents

Advertisement

Equipment Checklist

After unpacking the TigerStack, check the contents to be sure you have
received all the components. Then, before beginning the installation, be
sure you have all other necessary installation equipment.

Package Contents

• TigerStack 10/100, SMC6248M
• Four adhesive foot pads
• Bracket Mounting Kit containing two brackets and eight screws for
attaching the brackets to the switch
• Power Cord—either US, Continental Europe or UK
• RS-232 console cable
• This Installation Guide
• Management Guide
• SMC Warranty Registration Card—be sure to complete and return to
SMC

Optional Rack-Mounting Equipment

If you plan to rack-mount the switch, be sure to have the following
equipment available:
• Four mounting screws for each device you plan to install in a rack—these
are not included
• A screwdriver (Phillips or flathead, depending on the type of screws used)
E
C
QUIPMENT
HECKLIST
3-3

Advertisement

Table of Contents
loading

This manual is also suitable for:

6248m int

Table of Contents