INSTALLATION

Install the provided rack mounting brackets to the sides of DC12-IP with the provided screws. Adjust the distance of the rack ears to the front panel for the
desired position and tighten the screws.
Install the DC12-IP into the equipment rack.
Elevated Operating Temperature
If installed in a closed or multi-unit rack assembly, the ambient temperature of the rack environment may be greater than room ambient. Consider installing
the equipment in an environment compatible with the maximum ambient temperature (Tma) speci ed by the manufacturer.
Reduced Air Flow
Installation of the equipment in a rack should be such that the amount of air ow required for safe operation of the equipment is not compromised. It is
recommended that the rack space above the unit is not used.
Circuit Overloading
Consideration should be given to the connection of the equipment to the supply circuit, as well as the effect that circuit overloading might have on over-
current protection and supply wiring. Appropriate consideration of equipment nameplate ratings should be used when addressing this concern.
Disconnect Device (Pluggable Equipment)
The socket-outlet should be installed near the equipment and be easily accessible.