LG 55UR80 0PSB Series Service Manual page 35

Table of Contents

Advertisement

FINISH
※ When there is a T-con board, T-con board and FFC cable assembly (Only for application models)
- Insert the FFC cable into the connector and close the latch (same left/right method)
- Assemble 2 screws on the T-con board.
- 35 -
Copyright ©
LG Electronics Inc. All rights reserved.
Only for training and service purposes.
M3 screws 2ea

Advertisement

Table of Contents
loading

This manual is also suitable for:

55ur8000psa

Table of Contents