Download Print this page

Biddle HR 12 Manual page 21

Advertisement

HR 12 M
ANUAL
2.10
Switching on and checking operation
Manual version 1.0 (15-07-2018)
2.10.1 Introduction
Danger:
d
Make sure that all channel sections are
connected to fresh air, inside air and
ventilation units before you test the operation
of the unit.
2.10.2 Visual checking
1. Check the following attachments:
-
lock nuts of the suspension;
-
channel sections correctly connected and in the right
positions.
2. Check that the trap of the condensate drain is filled with
water.
3. Check the connections to the electronics module.
2.10.3 Switching ON
1. Insert the plug in the power socket.
2. Set the isolation switch to 1.
3. Check that no error messages are given.
2.10.4 Checking operation
If necessary, check the operation of the various fans and
valves. To do so, use the function
2.10.5 Calibrate air volume
The unit has two fans. Set the three speeds for each airflow.
I
NSTALLATION
Maintenance > Unit
control.
en-21
en

Advertisement

loading

Related Products for Biddle HR 12