Installation and Operation of: Drop In Flush Mount Cold Pan TABLE OF CONTENTS Important Safety Instructions ........................2-4 Introduction ................................5 Unpacking Unit ..............................5 Specifications ................................6 Installation ................................7 Operation .................................. 9 Changing Settings ...............................10 Cleaning ...................................12 IMPORTANT SAFETY INSTRUCTIONS Throughout this manual, you will find the following safety words and symbols that signify important safety risks with regards to operating or maintaining the equipment.
Page 3
• This equipment should be serviced by qualified personnel only. Contact the nearest Duke authorized service facility for adjustment or repair. • Do not block or cover any openings on the unit.
Page 4
Installation and Operation of: Drop In Flush Mount Cold Pan WARNING ELECTRICAL SHOCK HAZARD UNIT MUST BE SAFETY GROUNDED, EARTHED. DO NOT MODIFY, DEFEAT ELECTRICAL CONNECTIONS OR ALTER PLUG. ELECTRICAL CONNECTIONS BEFORE CONNECTING THE UNIT TO THE POWER SOURCE, VERIFY THAT THE VOLTAGE AND PHASE OF THE POWER SOURCE ARE IDENTICAL TO THE VOLTAGE AND PHASE INFORMATION ON THE DATA LABEL.
Installation and Operation of: Drop In Flush Mount Cold Pan INTRODUCTION Important to Note: • This unit has been designed to hold and maintain your cold products to the NSF7 standard. • Wells can be expected to reach set point temperature within a 30 minute time frame. UNPACKING UNIT Inspect the shipping carton and/or container, carefully noting any exterior damage on the delivery receipt;...
FCP4 Drop In, Flush Cold Pan "If using optional electric condensate 4-section With Drains - Shown evaporator add 300 Watts, 2.6 Amps" 120 Volt - HZ 60 Model Watts* Amps* NEMA FCP1-SB 5-15 FCP2-SB 5-15 FCP3-SB 5-15 FMCOLD PAN FCP4-SB 5-15...
Installation and Operation of: Drop In Flush Mount Cold Pan INSTALLATION WHEN MOUNTING BY THE OVERHANGING TOP RIM (IN A CUT-OUT IN THE COUNTER TOP): The underside of the overhanging top rim should have applied to it a generous bead of food grade silicone sealant before the unit is set into the cut-out in the counter top.
Page 8
Installation and Operation of: Drop In Flush Mount Cold Pan INSTALLATION - continued DROP-IN COLD PAN - AIR FLOW OPEN BODY Optional air intake louver mounts directly to cage support. No shroud or exhaust required for open body configuration. OPEN BODY DROP-IN COLD PAN - AIR FLOW CLOSED BODY Exhaust options rear or bottom required for closed body configuration.
Installation and Operation of: Drop In Flush Mount Cold Pan OPERATION Standard Controls Optional Mechanical Controls General Operating Instructions: Touch Screen Control Turn Cold Panl Unit on by positioning power switch Step 1 to the up position. Touch on/off button. Temperature Condensing Coil Controller...
Installation and Operation of: Drop In Flush Mount Cold Pan OPERATION - Changing Settings Step 1 Step 4 Step 7 Press settings button to enter Enter pin number. “0654” and You will need to select the back General Settings Screen. select OK.
Page 11
Installation and Operation of: Drop In Flush Mount Cold Pan OPERATION - Changing Settings Step 10 Step 12 Step 14 Using the plus or minus buttons Press “Admin. ” Slide the lock icon to lock the set the new temperature and presets, Press the check to save touch the check “√”...
Continuous operation with dirty or clogged condenser coils can result in compressor or fan failures. Neglecting the condenser coil cleaning procedures will void any warranties associated with the compressor or cost to replace the compressor and/or fan. Phone: 314-231-1130 Duke Manufacturing Co. Toll Free: 1-800-735-3853 2305 N. Broadway www.dukemfg.com Fax: 314-231-5074 St.
Need help?
Do you have a question about the FCP1-SB and is the answer not in the manual?
Questions and answers