Connect Probe/Solenoid Harness - Thermo Scientific 996 Operating And Maintenance Manual

-86c ultra low temperature freezer
Table of Contents

Advertisement

Section 5
Section 5
Factory Installed Options
Factory Installed Options
Connect Probe/Solenoid
5-4
Model 900 Series
Spade lug
connections
to solenoid
Figure 5-5. Probe wire and solenoid connections
1. Remove the four screws on the freezer back panel and use them to
mount the tie wrap anchors as shown in Figure 5-5. Secure the probe
Harness
wire with tie wraps.
2. Plug the solenoid/probe connector into the BUS connection and secure
with a screw on the right and left side. The connector is keyed.
3. Loosen the terminal screws on the solenoid. Slide the spade lug
connectors under the screws and tighten to secure.
4. Connect power to the freezer. Turn the freezer On, with battery switch
Off (O).
a. The Solenoid Engaged light on the BUS control panel will
illuminate (no injection occurs). This light stays on until the unit is
below BUS setpoint.
b. The Low Battery indicator may also illuminate.
5. Turn the battery switch to Standby mode ( ) to charge both batteries.
Remote Alarm
Power Outlet
Contacts
Tie wrap
anchor
Probe wire
BUS connection
Power switch
(mains disconnect)
Thermo Scientific

Advertisement

Table of Contents
loading

Table of Contents