5.2 Assembly SOP
Preparation before assembly
1. Clean the room for work
2. Identify the area for material
3. Prepare the implement, equipment, materials as bellow:
1) Working table
2) Philips-head screwdriver
3) Gloves
4) Cleaning cloth
5) ESD protection
6) U4919DW Curve Sponge Jig
Item
1
Picture
Operation
1. Assemble "WIRE
AC+3/3P" to Main
SHD and lock a
screw to fix it
2. Insert "SPS BD to
I/F BD wire" and
"WIRE AC+3/3P" to
SPS BD, then,
assemble SPS BD
to Main SHD
3. Insert "WIRE COAX
EDP 60P" into I/F
BD
4. Adhere a tape to fix
"WIRE COAX EDP
60P" on the back
side of I/F BD
- 16 -
Tool
Notes
Philips-head
Do not
screwdriver
touch the
component
(Screw Torque:
without
8.5±1 Kgf)
wearing
insulating
gloves
when
disassembli
ng and
assembling
Power BD